Antrim Wind
Antrim Wind is an operating wind farm located in Hillsborough, New Hampshire. It has a capacity of 29 MW. It became operational in 2019.
- Status
- Operating
- Capacity
- 29 MW
- Location
- Hillsborough, New Hampshire
- Developer
- On paid plans
- Operational
- December 2019
- Balancing authority
- ISNE
Location
Hillsborough, New Hampshire, outlined on the map
Wind farms near Antrim Wind
- Granite Reliable Power99 MW. Coos County, New Hampshire
- Groton Wind LLC48 MW. Grafton County, New Hampshire
- Lempster Wind LLC24 MW. Sullivan County, New Hampshire
- Jericho Power14 MW. Coos County, New Hampshire