Lempster Wind LLC
Lempster Wind LLC is an operating wind farm located in Sullivan County, New Hampshire. It has a capacity of 24 MW. It became operational in 2008.
- Status
- Operating
- Capacity
- 24 MW
- Location
- Sullivan County, New Hampshire
- Developer
- On paid plans
- Operational
- December 2008
- Balancing authority
- ISNE
Location
Sullivan County, New Hampshire, outlined on the map
Wind farms near Lempster Wind LLC
- Granite Reliable Power99 MW. Coos County, New Hampshire
- Groton Wind LLC48 MW. Grafton County, New Hampshire
- Antrim Wind29 MW. Hillsborough, New Hampshire
- Jericho Power14 MW. Coos County, New Hampshire