What each column in our data center, gas plant and power project downloads means, how it's measured and the values it can take.

Data centers

A row is one data center building, not a campus. A campus with six buildings is six rows, linked by the campus name.

A blank cell means we don't know the value yet. A blank is never a zero. The utility and grid fields are blank unless we know them with high confidence.

FieldDefinition
Project nameproject_name

Name of the data center building. Buildings on a shared campus are numbered: Building 1, Building 2, Building 3.

Developerdeveloper

Company developing or owning the building. Not necessarily the company using it: see Tenant and End user.

Developer experiencedeveloper_experience

Whether the developer has a track record building data centers.

Experienced
Has at least one operating or under-construction data center, or is an established developer with a track record (for example, Tract).
New entrant
Has no operating or under-construction data centers.
Statusstatus

Stage of development of the building.

Planned
Announced or permitted, but not yet under construction.
Under Construction
Vertical construction is underway.
Operating
Fitted out, with power and all equipment installed.
Canceled
Abandoned by the developer.
Operating yearoperating_year

Year the building came online, or is expected to come online.

Facility power (MW)capacity_mw

Total power the building draws at full build-out, including cooling and electrical overhead.

IT capacity (MW)it_capacity_mw

Power delivered to the servers themselves, excluding cooling and overhead. Also called critical IT load.

Building size (sq ft)building_square_footage

Gross floor space of the entire building at full build-out, in square feet.

Estimated investmentestimated_investment

Modeled all-in cost of the data center, in US dollars: the powered shell (building, power and mechanical and electrical systems) plus the servers, GPUs and networking inside it. Excludes on-site power generation.

Estimated at $38 million per MW of IT capacity. When only facility power is known, IT capacity is taken as facility power divided by 1.25.

Countycounty

County of the building's location.

Statestate

Two-letter state code of the building's location.

Campuscampus_name

Name of the campus the building belongs to. Buildings on the same campus share it.

Utilityutility

Retail utility whose service territory the building is in, even when the site plans to run on its own generation.

Utility parentutility_parent

The utility's parent company. Blank for co-ops and municipal and public utilities.

ISO/RTOiso_rto

Grid operator the building is in: PJM, ERCOT, MISO, SPP, CAISO, NYISO, ISO-NE, or Non-ISO.

Balancing authoritybalancing_authority

Balancing authority the building is in.

Utility EIA IDutility_eia_id

The utility's EIA utility number (EIA-861), for matching to EIA data.

Balancing authority codebalancing_authority_code

The balancing authority's EIA-930 code, for example ERCO, PJM or SOCO.

Tenanttenant_name

Company leasing capacity in the building, separated by commas when there are several. Filled only where a tenant has been publicly identified.

End userend_user_name

Company actually using the compute, when it differs from the tenant. A tenant may lease a building and resell its capacity to another company.

Latitudelatitude

Latitude of the building, in decimal degrees.

Longitudelongitude

Longitude of the building, in decimal degrees.

Source 1source_1

Primary source supporting the record. Where Cleanview has archived the document, the link is to that copy.

Source 2source_2

Additional supporting source.

Source 3source_3

Additional supporting source.

Behind-the-meter gas plants

A row is one gas plant built to serve a data center: behind the meter, on site and connected to the grid, or off site and dedicated to a named campus. Gas plants are a separate behind-the-meter subscription.

FieldDefinition
Plantplant_name

The plant's name in its permit, siting case or announcement. Otherwise, the data center's name followed by "power plant."

Developerdeveloper

Company that builds and owns the plant. Often not the data center developer: Williams builds Meta's plants in Ohio.

Data centercampus_name

Name of the data center campus the plant powers. Matches the campus name in the data center download.

Statusstatus

Status of the plant's most advanced unit that isn't canceled. A plant with an operating first stage and a second stage under construction is Operating. A plant is Canceled only when every unit is.

Announced
Announced or applied for. No air permit or siting approval has been issued.
Permitted
An air permit or state siting approval has been issued, but construction hasn't started.
Under Construction
Work on the generating equipment is underway: foundations, equipment on pads, stacks. Clearing and grading don't count.
Operating
Generating power for its data center, including temporary bridge power.
Canceled
The project won't be built.
Statestate

Two-letter state code of the plant's location.

Countycounty

County where the plant's generating equipment is.

Nameplate (MW)nameplate_mw

Number of machines times the manufacturer's rating, summed over the units that aren't canceled. This is the size of the power plant, not the data center's load, and it's usually larger than the load because of backup and redundancy.

Firm output (MW)firm_output_mw

Power the plant is contracted, permitted or stated to deliver to its data center. Filled only when a document states it.

Firm output basisfirm_output_basis

The kind of document behind the firm output.

contracted
A power purchase or supply contract.
permit limit
The output limit in the plant's permit.
net capacity
The plant's stated net capacity.
developer stated
A figure the developer has given publicly.
Configurationconfiguration

Kinds of generation at the plant, separated by semicolons.

Combined cycle
Gas turbines whose exhaust heat drives a steam turbine.
Simple cycle
Gas turbines without heat recovery.
Reciprocating engines
Gas-fired piston engines.
Fuel cells
Fuel cell servers running on natural gas.
OEMsoems

Equipment manufacturers at the plant, separated by semicolons. Blank until the equipment is public.

Modelsmodels

Equipment models at the plant, separated by semicolons.

Unitsmachines

Number of turbines, engines and fuel cell servers that aren't canceled. A minimum when a unit's count isn't public.

Yearfirst_operating_year

Year the plant's first unit began generating, or Cleanview's estimate of when it will.

Announcedannouncement_date

Date of the first public record of the plant (YYYY-MM-DD).

Air permitair_permit_url

Link to Cleanview's archived copy of the plant's issued air permit, or its latest amendment. Blank until the plant is permitted.

Latitudelatitude

Latitude of the plant's generating equipment, not the data center campus.

Longitudelongitude

Longitude of the plant's generating equipment, not the data center campus.

Grid-connected power projects

A row is one project in a grid operator's interconnection queue, or one generator in EIA's monthly survey of power plants (EIA-860M). The same plant can appear in both.

Each download covers one status. Planned projects come from the interconnection queues and EIA-860M, and operating projects from EIA-860M.

FieldDefinition
Projectproject_name

Project or power plant name, as the source gives it.

Developerdeveloper_name

Company developing or owning the project, as Cleanview has identified it from queue records, interconnection agreements and regulatory filings. Often the parent company of the project LLC named in the queue. Blank where we haven't identified it yet.

Capacity (MW)capacity_mw

Capacity of the project or generator in megawatts.

Dateoperating_date

For operating projects, the date the generator began operating. For planned projects, the date it's proposed to come online.

Technologytechnology

Standardized technology type, for example Solar, Wind, Battery, Natural Gas, Nuclear or Hybrid - Solar + Storage.

Countycounty

County of the project's location.

Statestate

Two-letter state code of the project's location.

Gridbalancing_authority

EIA-930 code of the balancing authority the project connects to, for example ERCO (ERCOT), PJM, MISO, CISO (CAISO), SWPP (SPP), NYIS (NYISO), ISNE (ISO-NE) or a utility's own, such as SOCO or DUK.

Statusstatus

Stage of development. Each download covers one status.

Planned
Active in an interconnection queue, or reported to EIA as planned.
Operating
Generating power, as reported to EIA.
IA signedhas_ia_signed

Whether the project has signed an interconnection agreement with its grid operator (true or false). Planned download only. Blank for EIA-860M rows.

Under constructionunder_construction

Whether the project has started construction (true or false). Planned download only. Blank for the CAISO, NYISO and SPP queues, which don't report it.

IR dateir_request_date

Date the project's interconnection request was filed (YYYY-MM-DD). Planned download only. Blank for EIA-860M rows.

Latitudelatitude

Latitude of the project, in decimal degrees.

Longitudelongitude

Longitude of the project, in decimal degrees.

Sourcesource_table

Where the record comes from.

eia_860m
EIA's monthly survey of power plants (EIA-860M).
*_queue
A grid operator's interconnection queue: caiso_queue, ercot_queue, miso_queue, ne_iso_queue, nyiso_queue, pjm_queue or spp_queue.
Source IDsource_id

The record's ID in its source: the queue position for queue projects (for example, AB2-089 in PJM), or the EIA plant ID and generator ID for EIA-860M rows (for example, 61179_JCCS3). Source and Source ID together identify a row.