Jericho Power
Jericho Power is an operating wind farm located in Coos County, New Hampshire. It has a capacity of 14 MW. It became operational in 2016.
- Status
- Operating
- Capacity
- 14 MW
- Location
- Coos County, New Hampshire
- Developer
- On paid plans
- Operational
- January 2016
- Balancing authority
- ISNE
Location
Coos County, New Hampshire, outlined on the map
Wind farms near Jericho Power
- Granite Reliable Power99 MW. Coos County, New Hampshire
- Groton Wind LLC48 MW. Grafton County, New Hampshire
- Antrim Wind29 MW. Hillsborough, New Hampshire
- Lempster Wind LLC24 MW. Sullivan County, New Hampshire