Granite Reliable Power
Granite Reliable Power is an operating wind farm located in Coos County, New Hampshire. It has a capacity of 99 MW. It became operational in 2012.
- Status
- Operating
- Capacity
- 99 MW
- Location
- Coos County, New Hampshire
- Developer
- On paid plans
- Operational
- February 2012
- Balancing authority
- ISNE
Location
Coos County, New Hampshire, outlined on the map
Wind farms near Granite Reliable Power
- Groton Wind LLC48 MW. Grafton County, New Hampshire
- Antrim Wind29 MW. Hillsborough, New Hampshire
- Lempster Wind LLC24 MW. Sullivan County, New Hampshire
- Jericho Power14 MW. Coos County, New Hampshire