US Data Center Tracker

Our analysts research each project from permits, utility filings and SEC documents, then check it against satellite images. You get the location, power capacity, status, tenant and utility of every building, with a link to the source.

Data centers, each building tracked on its own
4,319
Data center campuses
1,491
Data centers under construction
539
Satellite image of Microsoft Fairwater B2 (MKE04) under construction in Mount Pleasant, Wisconsin, with the data hall outlinedPléiades Neo © Airbus DS 2026
September 26, 2026, at 30 cm resolution.

Microsoft Fairwater B2 (MKE04)

One of 17 buildings on Microsoft’s campus in Mount Pleasant, Wisconsin.

Status
Under construction
Expected online
2027
Facility power
338 MW
IT capacity
270.4 MW
Size
635,195 sq ft
Utility
We Energies (WEC Energy Group)
Power market
MISO

Find projects before they make headlines

We monitor hundreds of public sources every day: air permits, building permits, zoning changes, utility filings and interconnection queues. That’s how we find projects months before anyone announces them.

We were the first to report Amazon’s GW Ranch in West Texas, one of the largest data center projects in the world. It will run on its own gas plant.

Read the scoop (opens in new tab)

Amazon GW Ranch example

Data center and on-site gas plant in Pecos County, Texas

  1. January 2026Texas regulators approve an air permit for a 5,000 MW gas plant in Pecos County, built to power an AI data center. The applicant is Pacifico GW LLC, and Amazon's name isn't on it. Our monitoring flags the permit and we start tracking the site.
  2. August 4, 2026A state building registration connects Amazon to the site. Amazon confirms our research.
  3. August 7, 2026We publish the story in the Cleanview newsletter.
  4. August 8, 2026The New York Times and outlets around the world pick it up.

Researched by analysts, one document at a time

Our analysts read permits, SEC filings and utility planning documents to find each project’s location, power capacity, size and tenant. AI tools help us find documents. People read them and make the calls.

Site plan SP-25-12, 12023 Durand Avenue, with the data center buildings outlined

Example source: site plan

Site plan SP-25-12, 12023 Durand Avenue

Village of Mount Pleasant Plan Commission, January 21, 2026

Data centers
9 one-story buildings
Each
579,796 sq ft
In all
About 5.2 million sq ft
Also
2 substations and a 96,000 sq ft office

View the site plan (opens in new tab)

Verified with satellite images

We check every project’s status and location from above. Monthly images show how fast construction is moving. High-resolution images, sharp enough to count generators and cooling units, show what stage a building has reached.

Satellite image of Google's Cedar Rapids campus, with Buildings 1 to 3, the cooling, generators and substation labeledPléiades Neo © Airbus DS 2026
Google's campus in Cedar Rapids, Iowa, March 20, 2026, at 30 cm resolution.

Power capacity for every building, year by year

We track two numbers. Facility power is everything the building draws from the grid. IT capacity is the power that reaches the servers.

We find them in developer disclosures, utility filings and air permits. When we check our estimates against figures developers later publish, we’re consistently within 5%.

Google Cedar Rapids reaches 608 MW by 2030

Facility power, MW, added up as each building comes online

OperatingUnder constructionPlanned
0200400600800202520262027202820292030Today608 MW
MISO’s list of new large loads puts the campus at 600 MW (opens in new tab). Our six buildings add up to 608 MW of facility power. Source: Cleanview data center tracker.

Where OpenAI and Anthropic are building

Campuses where either company is the tenant or the end user

OpenAIAnthropic
Source: Cleanview data center tracker, from leases, SEC filings and company announcements.

Know who’s behind every lease

The company that builds a data center often isn’t the one that uses it. We track the developer, the tenant and the end user of each building.

Some deals come from press releases. Many come from documents few people read: bond offerings, tax abatement filings and SEC disclosures.

See where the power comes from

For grid-connected data centers, we identify the utility and the power market serving each site. For data centers that build their own power plants, our behind-the-meter tracker covers the plants and the equipment inside them.

PJM has the most data center capacity under construction

Facility power under construction, GW

By power market

PJM
15.5
ERCOT
13.7
Non-ISO
11.9
MISO
9.3
SPP
2.2
NYISO
0.4
CAISO
0.2

By utility parent company

Dominion Energy
4.5
American Electric Power
3.7
Entergy
2.7
Berkshire Hathaway Energy
2.7
Sempra
2.2
Infrastructure Investments Fund
2.1
Alliant Energy
2.0
WEC Energy Group
1.9
Source: Cleanview data center tracker. Non-ISO is the Southeast and the West, where utilities run their own grids.