Monte Cristo Solar 1
Monte Cristo Solar 1 is a planned solar farm located in Esmeralda County, Nevada. It would have a capacity of 523 MW. It is expected to come online in December 2030.
- Status
- Planned
- Capacity
- 523 MW
- Location
- Esmeralda County, Nevada
- Developer
- On paid plans
- Expected online
- December 2030
- Balancing authority
- CISO
Location
Esmeralda County, Nevada, outlined on the map
Planned solar farms near Monte Cristo Solar 1
- Ashton Energy Center1,027 MW. Nye County, Nevada
- Chance Solar896 MW. Nye County, Nevada
- Arida 2 Solar Farm700 MW. Clark County, Nevada
- Libra Solar700 MW. Lyon County, Nevada
- Mosey544 MW. Clark County, Nevada
- Monte Cristo Solar 2523 MW. Esmeralda County, Nevada
- Silver Star Solar517 MW. Nye County, Nevada
- Water Rock Solar 2517 MW. Nye County, Nevada
- Amargosa Sez510 MW. Nye County, Nevada
- Rock Valley Energy Center509 MW. Nye County, Nevada
- Bristlecone461 MW. Nye County, Nevada
- Arida 3 Solar Farm450 MW. Clark County, Nevada