South Peak Wind
South Peak Wind is an operating wind farm located in Judith Basin County, Montana. It has a capacity of 80 MW. It became operational in 2020.
- Status
- Operating
- Capacity
- 80 MW
- Location
- Judith Basin County, Montana
- Developer
- On paid plans
- Operational
- April 2020
- Balancing authority
- NWMT
Location
Judith Basin County, Montana, outlined on the map
Wind farms near South Peak Wind
- Beaver Creek Wind Facility434 MW. Stillwater County, Montana
- Clearwater Wind I366 MW. Rosebud County, Montana
- Pryor Mountain Wind240 MW. Carbon County, Montana
- Clearwater Wind East208 MW. Custer County, Montana
- NaturEner Rim Rock Energy189 MW. Toole County, Montana
- Judith Gap Wind Energy Center135 MW. Wheatland County, Montana
- NaturEner Glacier Wind Energy 1107 MW. Toole County, Montana
- NaturEner Glacier Wind Energy 2104 MW. Toole County, Montana
- Clearwater Wind II103 MW. Rosebud County, Montana
- Clearwater Wind III100 MW. Rosebud County, Montana
- Stillwater Wind, LLC80 MW. Stillwater County, Montana
- Spion Kop Wind Farm40 MW. Judith Basin County, Montana