Antares-GRE 314 East Lyme LLC
Antares-GRE 314 East Lyme LLC is an operating solar farm located in New London County, Connecticut. It has a capacity of 4 MW. It became operational in 2014.
- Status
- Operating
- Capacity
- 4 MW
- Location
- New London County, Connecticut
- Developer
- On paid plans
- Operational
- June 2014
- Balancing authority
- ISNE
Location
New London County, Connecticut, outlined on the map
Solar farms near Antares-GRE 314 East Lyme LLC
- Fusion Solar Center LLC20 MW. New London County, Connecticut
- North Stonington Solar Center, LLC15 MW. New London County, Connecticut
- SR North Stonington12 MW. New London County, Connecticut
- North Franklin Solar5 MW. New London County, Connecticut
- CMEEC - Polaris Park Solar Hybrid4 MW. New London County, Connecticut
- CMEEC - Norwich Stott St Solar Hybrid4 MW. New London County, Connecticut
- CMEEC - Bozrah3 MW. New London County, Connecticut