CMEEC - Norwich Stott St Solar Hybrid
CMEEC - Norwich Stott St Solar Hybrid is an operating battery storage project located in New London County, Connecticut. It has a capacity of 4 MW. It became operational in 2016.
- Status
- Operating
- Capacity
- 4 MW
- Location
- New London County, Connecticut
- Developer
- On paid plans
- Operational
- December 2016
- Balancing authority
- ISNE
Location
New London County, Connecticut, outlined on the map
Battery storage projects near CMEEC - Norwich Stott St Solar Hybrid
- CMEEC - Polaris Park Solar Hybrid1 MW. New London County, Connecticut