Steel River Solar Phase 1
Steel River Solar Phase 1 is a planned battery storage project located in Mississippi County, Arkansas. It would have a capacity of 250 MW. It is expected to come online in August 2028.
- Status
- Planned
- Capacity
- 250 MW
- Location
- Mississippi County, Arkansas
- Developer
- On paid plans
- Expected online
- August 2028
- Balancing authority
- MISO
Location
Mississippi County, Arkansas, outlined on the map
Planned battery storage projects near Steel River Solar Phase 1
- Steel River Solar Phase 2250 MW. Mississippi County, Arkansas
- Steel River Solar Phase 3250 MW. Mississippi County, Arkansas
- BLYTHEVILLE I-55 - AECC BLYTHEVILLE NORTH 161.0kV200 MW. Mississippi County, Arkansas