Chevelon Butte Phase 2
Chevelon Butte Phase 2 is an operating wind farm located in Coconino County, Arizona. It has a capacity of 216 MW. It became operational in 2024.
- Status
- Operating
- Capacity
- 216 MW
- Location
- Coconino County, Arizona
- Developer
- On paid plans
- Operational
- April 2024
- Balancing authority
- AZPS
Location
Coconino County, Arizona, outlined on the map
Wind farms near Chevelon Butte Phase 2
- Chevelon Butte Wind Farm238 MW. Coconino County, Arizona
- Babbitt Ranch Energy Center163 MW. Coconino County, Arizona
- Perrin Ranch Wind LLC99 MW. Coconino County, Arizona