Babbitt Ranch Energy Center
Babbitt Ranch Energy Center is an operating wind farm located in Coconino County, Arizona. It has a capacity of 163 MW. It became operational in 2024.
- Status
- Operating
- Capacity
- 163 MW
- Location
- Coconino County, Arizona
- Developer
- On paid plans
- Operational
- July 2024
- Balancing authority
- SRP
Location
Coconino County, Arizona, outlined on the map
Wind farms near Babbitt Ranch Energy Center
- Chevelon Butte Wind Farm238 MW. Coconino County, Arizona
- Chevelon Butte Phase 2216 MW. Coconino County, Arizona
- Perrin Ranch Wind LLC99 MW. Coconino County, Arizona