Hecate Energy Outpost Solar LLC
Hecate Energy Outpost Solar LLC is an operating solar farm located in Webb County, Texas. It has a capacity of 515 MW. It became operational in 2025.
- Status
- Operating
- Capacity
- 515 MW
- Location
- Webb County, Texas
- Developer
- On paid plans
- Operational
- August 2025
- Balancing authority
- ERCO
Location
Webb County, Texas, outlined on the map
Solar farms near Hecate Energy Outpost Solar LLC
- Hecate Energy Longhorn Solar LLC650 MW. Jack County, Texas
- Hornet Solar (TX)600 MW. Swisher County, Texas
- Hecate Energy Frye Solar LLC500 MW. Swisher County, Texas
- Aktina Solar500 MW. Wharton County, Texas
- Mockingbird Solar Center471 MW. Lamar County, Texas
- Old 300 Solar Center, LLC430 MW. Fort Bend County, Texas
- 2W Permian Solar Project Hybrid420 MW. Andrews County, Texas
- Ash Creek Solar409 MW. Hill County, Texas
- Sequoia 1401 MW. Eastland County, Texas
- Waco Solar400 MW. Limestone County, Texas
- Red Tailed Hawk Solar LLC360 MW. Wharton County, Texas
- Five Wells Solar Center - Hybrid355 MW. Bell County, Texas