Dolores Canyon Solar
Dolores Canyon Solar is an operating solar farm located in Dolores County, Colorado. It has a capacity of 110 MW. It became operational in 2025.
- Status
- Operating
- Capacity
- 110 MW
- Location
- Dolores County, Colorado
- Developer
- On paid plans
- Operational
- November 2025
- Balancing authority
- WACM
Location
Dolores County, Colorado, outlined on the map
Solar farms near Dolores Canyon Solar
- Neptune Energy Center Hybrid325 MW. Pueblo County, Colorado
- Rocky Mountain Solar325 MW. Pueblo County, Colorado
- Black Hollow Sun257 MW. Weld County, Colorado
- Thunder Wolf Energy Center Hybrid248 MW. Pueblo County, Colorado
- Bighorn Solar 1240 MW. Pueblo County, Colorado
- Sun Mountain Solar 1200 MW. Pueblo County, Colorado
- Pike Solar Hybrid175 MW. El Paso County, Colorado
- Axial Basin Solar145 MW. Moffat County, Colorado
- Spanish Peaks Solar140 MW. Las Animas County, Colorado
- Comanche Solar120 MW. Pueblo County, Colorado
- Pioneer Solar (CO), LLC80 MW. Adams County, Colorado
- Garnet Mesa Solar80 MW. Delta County, Colorado