Pike Solar Hybrid
Pike Solar Hybrid is an operating solar farm located in El Paso County, Colorado. It has a capacity of 175 MW. It became operational in 2023.
- Status
- Operating
- Capacity
- 175 MW
- Location
- El Paso County, Colorado
- Developer
- On paid plans
- Operational
- December 2023
- Balancing authority
- PSCO
Location
El Paso County, Colorado, outlined on the map
Solar farms near Pike Solar Hybrid
- Palmer Solar60 MW. El Paso County, Colorado
- Grazing Yak Solar35 MW. El Paso County, Colorado
- Clear Spring Ranch PV Project10 MW. El Paso County, Colorado
- AFA Solar Farm6 MW. El Paso County, Colorado