Palmer Solar
Palmer Solar is an operating solar farm located in El Paso County, Colorado. It has a capacity of 60 MW. It became operational in 2020.
- Status
- Operating
- Capacity
- 60 MW
- Location
- El Paso County, Colorado
- Developer
- On paid plans
- Operational
- April 2020
- Balancing authority
- WACM
Location
El Paso County, Colorado, outlined on the map
Solar farms near Palmer Solar
- Pike Solar Hybrid175 MW. El Paso County, Colorado
- Grazing Yak Solar35 MW. El Paso County, Colorado
- Clear Spring Ranch PV Project10 MW. El Paso County, Colorado
- AFA Solar Farm6 MW. El Paso County, Colorado