Perris DC 5 - sline015
Perris DC 5 - sline015 is an operating solar farm located in Riverside County, California. It has a capacity of 2 MW. It became operational in 2026.
- Status
- Operating
- Capacity
- 2 MW
- Location
- Riverside County, California
- Developer
- On paid plans
- Operational
- September 2026
- Balancing authority
- CISO
Location
Riverside County, California, outlined on the map
Solar farms near Perris DC 5 - sline015
- Desert Quartzite300 MW. Riverside County, California
- Arica Solar263 MW. Riverside County, California
- Athos Solar Project250 MW. Riverside County, California
- Oberon Solar Project250 MW. Riverside County, California
- Oberon II Solar Project250 MW. Riverside County, California
- Blythe Mesa Solar II224 MW. Riverside County, California
- SE Athos II, LLC200 MW. Riverside County, California
- Victory Pass200 MW. Riverside County, California
- Blythe Solar III, LLC Hybrid137 MW. Riverside County, California