HMV Minster Energy Storage System
HMV Minster Energy Storage System is an operating battery storage project located in Auglaize County, Ohio. It has a capacity of 7 MW. It became operational in 2016.
- Status
- Operating
- Capacity
- 7 MW
- Location
- Auglaize County, Ohio
- Developer
- On paid plans
- Operational
- March 2016
- Balancing authority
- PJM
Location
Auglaize County, Ohio, outlined on the map
Battery storage projects near HMV Minster Energy Storage System
- Bowling Green Energy Storage Project12 MW. Wood County, Ohio
- Shelby BESS10 MW. Richland County, Ohio
- Walter C Beckjord4 MW. Clermont County, Ohio
- KSU Solar Array2 MW. Portage County, Ohio
- Northwest Ohio Wind1 MW. Paulding County, Ohio