Escape Solar Plant
Escape Solar Plant is an operating battery storage project located in Lincoln County, Nevada. It has a capacity of 285 MW. It became operational in 2025.
- Status
- Operating
- Capacity
- 285 MW
- Location
- Lincoln County, Nevada
- Developer
- On paid plans
- Operational
- November 2025
- Balancing authority
- NEVP
Location
Lincoln County, Nevada, outlined on the map
Battery storage projects near Escape Solar Plant
- Sierra Solar Hybrid400 MW. Churchill County, Nevada
- Gemini Solar Hybrid380 MW. Clark County, Nevada
- Silver Peak279 MW. Clark County, Nevada
- Reid Gardner220 MW. Clark County, Nevada
- Silver State South Storage200 MW. Clark County, Nevada
- Dry Lake Solar Energy Center100 MW. Clark County, Nevada
- Townsite Solar Project Hybrid90 MW. Clark County, Nevada
- Yellow Pine II85 MW. Clark County, Nevada
- Arrow Canyon Solar Hybrid75 MW. Clark County, Nevada
- Yellow Pine Solar65 MW. Clark County, Nevada
- Dodge Flat50 MW. Washoe County, Nevada
- Battle Mountain Solar Project25 MW. Humboldt County, Nevada