Battle Mountain Solar Project
Battle Mountain Solar Project is an operating battery storage project located in Humboldt County, Nevada. It has a capacity of 126 MW. It became operational in 2021.
- Status
- Operating
- Capacity
- 126 MW
- Location
- Humboldt County, Nevada
- Developer
- On paid plans
- Operational
- June 2021
- Balancing authority
- NEVP
Location
Humboldt County, Nevada, outlined on the map
Battery storage projects near Battle Mountain Solar Project
- Sierra Solar Hybrid400 MW. Churchill County, Nevada
- Gemini Solar Hybrid380 MW. Clark County, Nevada
- Silver Peak279 MW. Clark County, Nevada
- Reid Gardner220 MW. Clark County, Nevada
- Silver State South Storage200 MW. Clark County, Nevada
- Dry Lake Solar Energy Center100 MW. Clark County, Nevada
- Escape Solar Plant100 MW. Lincoln County, Nevada
- Townsite Solar Project Hybrid90 MW. Clark County, Nevada
- Yellow Pine II85 MW. Clark County, Nevada
- Arrow Canyon Solar Hybrid75 MW. Clark County, Nevada
- Yellow Pine Solar65 MW. Clark County, Nevada
- Dodge Flat50 MW. Washoe County, Nevada