Townsite Solar Project Hybrid
Townsite Solar Project Hybrid is an operating battery storage project located in Clark County, Nevada. It has a capacity of 270 MW. It became operational in 2021.
- Status
- Operating
- Capacity
- 270 MW
- Location
- Clark County, Nevada
- Developer
- On paid plans
- Operational
- December 2021
- Balancing authority
- WALC
Location
Clark County, Nevada, outlined on the map
Battery storage projects near Townsite Solar Project Hybrid
- Gemini Solar Hybrid380 MW. Clark County, Nevada
- Silver Peak279 MW. Clark County, Nevada
- Reid Gardner220 MW. Clark County, Nevada
- Silver State South Storage200 MW. Clark County, Nevada
- Dry Lake Solar Energy Center100 MW. Clark County, Nevada
- Yellow Pine II85 MW. Clark County, Nevada
- Arrow Canyon Solar Hybrid75 MW. Clark County, Nevada
- Yellow Pine Solar65 MW. Clark County, Nevada