Line tap DELL to Manilla AECC 161 kV
Line tap DELL to Manilla AECC 161 kV is a planned solar farm located in Mississippi County, Arkansas. It would have a capacity of 200 MW. It is expected to come online in December 2027.
- Status
- Planned
- Capacity
- 200 MW
- Location
- Mississippi County, Arkansas
- Developer
- On paid plans
- Expected online
- December 2027
- Balancing authority
- MISO
Location
Mississippi County, Arkansas, outlined on the map
Planned solar farms near Line tap DELL to Manilla AECC 161 kV
- Steel River Solar Phase 1500 MW. Mississippi County, Arkansas
- Steel River Solar Phase 2500 MW. Mississippi County, Arkansas
- Steel River Solar Phase 3500 MW. Mississippi County, Arkansas
- Sandy Bayou500 MW. Mississippi County, Arkansas
- DELL EHV - SAN SOUCI 500.0kV500 MW. Mississippi County, Arkansas
- Sandy Bayou440 MW. Mississippi County, Arkansas
- Dell to Nucor 161 kV250 MW. Mississippi County, Arkansas
- BLYTHEVILLE I-55 - AECC BLYTHEVILLE NORTH 161.0kV200 MW. Mississippi County, Arkansas
- 161 kV line tap of DELL EAST to Blytheville200 MW. Mississippi County, Arkansas
- MONETTE JUNCTION - PARAGOULD 161.0kV150 MW. Mississippi County, Arkansas
- Driver 203kV Substation100 MW. Mississippi County, Arkansas