Solar BESS Hybrid
Solar BESS Hybrid is a planned natural gas power plant located in Cobb County, Georgia. It would have a capacity of 2 MW. It is expected to come online in May 2027.
- Status
- Planned
- Capacity
- 2 MW
- Location
- Cobb County, Georgia
- Developer
- On paid plans
- Expected online
- May 2027
- Balancing authority
- SOCO
Location
Cobb County, Georgia, outlined on the map
Planned natural gas power plants near Solar BESS Hybrid
- Yates483 MW. Coweta County, Georgia
- Yates483 MW. Coweta County, Georgia
- Yates483 MW. Coweta County, Georgia
- Smarr Combined Cycle Energy Facility459 MW. Monroe County, Georgia
- Smarr Combined Cycle Energy Facility345 MW. Monroe County, Georgia
- Talbot County Energy262 MW. Talbot County, Georgia
- Solar BESS Hybrid2 MW. Cobb County, Georgia
- Solar BESS Hybrid2 MW. Cobb County, Georgia