El Centro Hybrid
El Centro Hybrid is a planned natural gas power plant located in Imperial County, California. It would have a capacity of 19 MW. It is expected to come online in September 2029.
- Status
- Planned
- Capacity
- 19 MW
- Location
- Imperial County, California
- Developer
- On paid plans
- Expected online
- September 2029
- Balancing authority
- IID
Location
Imperial County, California, outlined on the map
Planned natural gas power plants near El Centro Hybrid
- El Centro Hybrid19 MW. Imperial County, California
- El Centro Hybrid19 MW. Imperial County, California
- El Centro Hybrid19 MW. Imperial County, California
- El Centro Hybrid19 MW. Imperial County, California
- El Centro Hybrid19 MW. Imperial County, California