Green River Energy Center - Hybrid
Green River Energy Center - Hybrid is an operating solar farm located in Emery County, Utah. It has a capacity of 800 MW. It became operational in 2026.
- Status
- Operating
- Capacity
- 800 MW
- Location
- Emery County, Utah
- Developer
- On paid plans
- Operational
- June 2026
- Balancing authority
- PACE
Location
Emery County, Utah, outlined on the map
Solar farms near Green River Energy Center - Hybrid
- Hornshadow Solar II, LLC200 MW. Emery County, Utah
- Hunter Solar LLC (UT)100 MW. Emery County, Utah
- Hornshadow Solar, LLC100 MW. Emery County, Utah
- Castle Solar, LLC40 MW. Emery County, Utah