Hooper Solar
Hooper Solar is an operating solar farm located in Alamosa County, Colorado. It has a capacity of 52 MW. It became operational in 2015.
- Status
- Operating
- Capacity
- 52 MW
- Location
- Alamosa County, Colorado
- Developer
- On paid plans
- Operational
- December 2015
- Balancing authority
- PSCO
Location
Alamosa County, Colorado, outlined on the map
Solar farms near Hooper Solar
- San Luis Valley Solar Ranch35 MW. Alamosa County, Colorado
- Alamosa Solar30 MW. Alamosa County, Colorado
- Greater Sandhill I19 MW. Alamosa County, Colorado
- SunE Alamosa7 MW. Alamosa County, Colorado