Heber City
Heber City is an operating natural gas power plant located in Wasatch County, Utah. It has a capacity of 18 MW. It became operational in 2024.
- Status
- Operating
- Capacity
- 18 MW
- Location
- Wasatch County, Utah
- Developer
- On paid plans
- Operational
- March 2024
- Balancing authority
- PACE
Location
Wasatch County, Utah, outlined on the map
Natural gas power plants near Heber City
- Lake Side Power Plant1,247 MW. Utah County, Utah
- Intermountain Power Project1,093 MW. Millard County, Utah
- Currant Creek567 MW. Juab County, Utah
- Gadsby433 MW. Salt Lake County, Utah
- West Valley Generation Project217 MW. Salt Lake County, Utah
- Nebo Power Station140 MW. Utah County, Utah
- Millcreek Power Generation80 MW. Washington County, Utah
- Murray Turbine42 MW. Salt Lake County, Utah
- Tesoro SLC Cogeneration Plant30 MW. Salt Lake County, Utah
- Bountiful City30 MW. Davis County, Utah
- BYU Central Heating Plant17 MW. Utah County, Utah
- Logan City16 MW. Cache County, Utah