Hydro II
Hydro II is an operating hydro power plant located in Cache County, Utah. It has a capacity of 7 MW. It became operational in 1986.
- Status
- Operating
- Capacity
- 7 MW
- Location
- Cache County, Utah
- Developer
- On paid plans
- Operational
- May 1986
- Balancing authority
- PACE
Location
Cache County, Utah, outlined on the map
Hydro power plants near Hydro II
- Flaming Gorge152 MW. Daggett County, Utah
- Cutler Hydro30 MW. Box Elder County, Utah
- Jordanelle Dam Hydroelectric Project13 MW. Wasatch County, Utah
- Pioneer5 MW. Weber County, Utah
- Deer Creek (UT)5 MW. Wasatch County, Utah
- Little Cottonwood5 MW. Salt Lake County, Utah
- Echo Dam4 MW. Summit County, Utah
- Boulder4 MW. Garfield County, Utah
- Gateway4 MW. Morgan County, Utah
- Weber4 MW. Weber County, Utah
- Spanish Fork3 MW. Utah County, Utah
- Hydro Plant No 33 MW. Sanpete County, Utah