Solar BESS Hybrid
Solar BESS Hybrid is an operating battery storage project located in Cobb County, Georgia. It has a capacity of 4 MW. It became operational in 2022.
- Status
- Operating
- Capacity
- 4 MW
- Location
- Cobb County, Georgia
- Developer
- On paid plans
- Operational
- September 2022
- Balancing authority
- SOCO
Location
Cobb County, Georgia, outlined on the map
Battery storage projects near Solar BESS Hybrid
- McGrau Ford Battery Storage Facility530 MW. Cherokee County, Georgia
- Robins Air Force Base Solar128 MW. Bibb County, Georgia
- Mossy Branch Battery Facility65 MW. Talbot County, Georgia
- Moody Air Force Base Solar50 MW. Lowndes County, Georgia
- Hickory Park Solar Hybrid40 MW. Mitchell County, Georgia
- Cool Springs Solar (Hybrid)40 MW. Decatur County, Georgia
- Allatoona Substation #1010 MW. Cobb County, Georgia
- Tech Square Microgrid0 MW. Fulton County, Georgia