Gemini Solar Hybrid
Gemini Solar Hybrid is an operating solar farm located in Clark County, Nevada. It has a capacity of 1,070 MW. It became operational in 2024.
- Status
- Operating
- Capacity
- 1,070 MW
- Location
- Clark County, Nevada
- Developer
- On paid plans
- Operational
- March 2024
- Balancing authority
- NEVP
Location
Clark County, Nevada, outlined on the map
Solar farms near Gemini Solar Hybrid
- Eagle Shadow Mountain Solar Farm300 MW. Clark County, Nevada
- Silver State Solar Power South260 MW. Clark County, Nevada
- Copper Mountain Solar 5, LLC252 MW. Clark County, Nevada
- Moapa Southern Paiute250 MW. Clark County, Nevada
- Techren Solar II LLC200 MW. Clark County, Nevada
- Arrow Canyon Solar Hybrid200 MW. Clark County, Nevada
- Townsite Solar Project Hybrid180 MW. Clark County, Nevada
- Copper Mountain Solar 2154 MW. Clark County, Nevada
- Dry Lake Solar Energy Center150 MW. Clark County, Nevada
- Yellow Pine Solar125 MW. Clark County, Nevada
- Yellow Pine II125 MW. Clark County, Nevada
- Playa Solar 2100 MW. Clark County, Nevada