Snipatuit Road Solar
Snipatuit Road Solar is a planned solar farm located in Plymouth County, Massachusetts. It would have a capacity of 4 MW. It is expected to come online in March 2027.
- Status
- Planned
- Capacity
- 4 MW
- Location
- Plymouth County, Massachusetts
- Developer
- On paid plans
- Expected online
- March 2027
- Balancing authority
- ISNE
Location
Plymouth County, Massachusetts, outlined on the map
Planned solar farms near Snipatuit Road Solar
- Solar7 MW. Plymouth County, Massachusetts
- Braley Hill North Solar5 MW. Plymouth County, Massachusetts
- Randall Lane Solar5 MW. Plymouth County, Massachusetts
- Logging Swamp North5 MW. Plymouth County, Massachusetts
- Logging Swamp South5 MW. Plymouth County, Massachusetts
- Cushman Road Solar3 MW. Plymouth County, Massachusetts
- Solar Carver 1 Hybrid2 MW. Plymouth County, Massachusetts
- Solar Carver 3 Hybrid1 MW. Plymouth County, Massachusetts
- Featherbed Lane South Solar1 MW. Plymouth County, Massachusetts