Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904
Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904 is a planned solar farm located in Sabine Parish, Louisiana. It would have a capacity of 180 MW. It is expected to come online in September 2026.
- Status
- Planned
- Capacity
- 180 MW
- Location
- Sabine Parish, Louisiana
- Developer
- On paid plans
- Expected online
- September 2026
- Balancing authority
- MISO
Location
Sabine Parish, Louisiana, outlined on the map
Planned solar farms near Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904
- HARTBURG - AEP LAYFIELD 500.0kV270 MW. Sabine Parish, Louisiana
- Fisher250 MW. Sabine Parish, Louisiana
- Hollis Creek Solar220 MW. Sabine Parish, Louisiana
- Fisher - Marthaville 230.0kV200 MW. Sabine Parish, Louisiana