Stampede Solar Hybrid
Stampede Solar Hybrid is an operating solar farm located in Hopkins County, Texas. It has a capacity of 328 MW. It became operational in 2025.
- Status
- Operating
- Capacity
- 328 MW
- Location
- Hopkins County, Texas
- Developer
- On paid plans
- Operational
- November 2025
- Balancing authority
- ERCO
Location
Hopkins County, Texas, outlined on the map
Solar farms near Stampede Solar Hybrid
- Bright Arrow Solar, LLC300 MW. Hopkins County, Texas
- Pine Forest Solar I300 MW. Hopkins County, Texas
- Hopkins Energy LLC250 MW. Hopkins County, Texas