Escape Solar Plant
Escape Solar Plant is an operating solar farm located in Lincoln County, Nevada. It has a capacity of 285 MW. It became operational in 2025.
- Status
- Operating
- Capacity
- 285 MW
- Location
- Lincoln County, Nevada
- Developer
- On paid plans
- Operational
- November 2025
- Balancing authority
- NEVP
Location
Lincoln County, Nevada, outlined on the map
Solar farms near Escape Solar Plant
- Gemini Solar Hybrid690 MW. Clark County, Nevada
- Eagle Shadow Mountain Solar Farm300 MW. Clark County, Nevada
- Silver State Solar Power South260 MW. Clark County, Nevada
- Copper Mountain Solar 5, LLC252 MW. Clark County, Nevada
- Moapa Southern Paiute250 MW. Clark County, Nevada
- Techren Solar II LLC200 MW. Clark County, Nevada
- Arrow Canyon Solar Hybrid200 MW. Clark County, Nevada
- Dodge Flat200 MW. Washoe County, Nevada
- TS Power Plant200 MW. Eureka County, Nevada
- Townsite Solar Project Hybrid180 MW. Clark County, Nevada
- Copper Mountain Solar 2154 MW. Clark County, Nevada
- Dry Lake Solar Energy Center150 MW. Clark County, Nevada