Sierra Solar Hybrid
Sierra Solar Hybrid is an operating battery storage project located in Churchill County, Nevada. It has a capacity of 400 MW. It became operational in 2026.
- Status
- Operating
- Capacity
- 400 MW
- Location
- Churchill County, Nevada
- Developer
- On paid plans
- Operational
- March 2026
- Balancing authority
- NEVP
Location
Churchill County, Nevada, outlined on the map
Planned battery storage projects near Sierra Solar Hybrid
- Arida 2 Solar Farm700 MW. Clark County, Nevada
- Libra Solar700 MW. Lyon County, Nevada
- Mosey537 MW. Clark County, Nevada
- Silver Star Solar517 MW. Nye County, Nevada
- Water Rock Solar 2517 MW. Nye County, Nevada
- Rock Valley Energy Center515 MW. Nye County, Nevada
- Bristlecone460 MW. Nye County, Nevada
- Arida 3 Solar Farm450 MW. Clark County, Nevada
- Purple Sage Energy Center408 MW. Clark County, Nevada
- Purple Sage Energy Center400 MW. Clark County, Nevada
- Arida Solar Farm370 MW. Clark County, Nevada
- Arida Solar (Hybrid)370 MW. Clark County, Nevada