Imeson Solar
Imeson Solar is an operating battery storage project located in Duval County, Florida. It has a capacity of 10 MW. It became operational in 2019.
- Status
- Operating
- Capacity
- 10 MW
- Location
- Duval County, Florida
- Developer
- On paid plans
- Operational
- December 2019
- Balancing authority
- JEA
Location
Duval County, Florida, outlined on the map
Battery storage projects near Imeson Solar
- Manatee Solar Energy Center409 MW. Manatee County, Florida
- FPL Chipola River Solar Energy Center75 MW. Calhoun County, Florida
- FPL Shirer Branch Solar Energy Center75 MW. Calhoun County, Florida
- Blackwater River Solar Energy Center75 MW. Santa Rosa County, Florida
- Canoe75 MW. Okaloosa County, Florida
- Tenmile Creek75 MW. Calhoun County, Florida
- Kayak75 MW. Okaloosa County, Florida
- Fourmile Creek75 MW. Calhoun County, Florida
- Wimauma Solar and Battery Storage40 MW. Hillsborough, Florida
- Lake Mabel Solar and Battery Storage40 MW. Polk County, Florida
- Sunshine Gateway Solar Energy Center30 MW. Columbia County, Florida
- Echo River Solar30 MW. Suwannee County, Florida